195. Carpet is laid in the "mall" area. (9/1/09)
196. A screen is installed in the back of the gym for those on stage to look out and read. (9/1/09)
197. John Skaggs and Brian Southern work on installing projection equipment. (9/1/09)
198. A little do-it-yourself-work, saves the church installation costs. (9/1/09)
199. The "mall" is completely carpeted. (9/2/09)
200. Vinyl tile goes on the stage. (9/2/09)
201. The front parking lot is having some repairs before we completely reseal it. (9/21/09)
202. More parking lot repairs today. (9/21/09)
203. The memorial bricks that were engraved are installed on the west side of the building. (9/21/09)
204. Dave McNamee oversees the brick installation. (9/21/09)
205. A close up view of the bricks. (9/21/09)
206. The gym floor installation begins with cleaning the floor and then they roll out and glue rubber mats to the floor-22 in all. (9/21/09)
207. Grey sealer has been trowled over the mats. (9/23/09)
208. A light coat of finish color has been put on which is about 10 buckets. Each bucket is 5 gallons. The finish color is installed next and over 100 buckets of the color is used. (9/24 and 9/25/09)
209. Lines for the various courts (basketball and volleyball) are taped on and prepared for paint. (10/1/09)


Click to veiw build photos during Aug. 2009.

Click to view build photos during July 2009

Click to view build photos during June 2009

Click to view build photos during May 2009

Click to view build photos during April 2009

Click to view build photos during: October 2008 - March 2009

Back to Top