120. The glass doors to Fellowship Hall have come down and a temporary plywood wall has been constructed between the new building and current building. (7/9/09)
121. In the kitchen you can see the oven hood has been installed. The kitchen is prepared for the epoxy floor to be installed soon. (7/9/09)
122. The kitchen walls have been installed. (7/9/09)
123. The community room is being primed. (7/9/09)
124. Dr. Hertel talks with Rick Wright (T&W Project Superintendent) and Barney Boyd (Architect). (7/9/09)
125. The stage drywall goes up. (7/9/09)
126. Drywall goes up in the youth area. (7/9/09)
127. The corridor off the "mall" area is primed for paint. (7/9/09)
128. A worker prepares to put down the epoxy floor in the kitchen. (7/9/09)
129. Drywall work continues on the bulk heads. (7/15/09)
130. A neat view of the skylight as drywalk work is done. (7/15/09)
131. Drywall is smoothed out in the "mall" area. (7/15/09)
132. The gymnasium ceiling is painted and the walls too. (7/15/09)
133. The epoxy floor in the kitchen is complete. (7/15/09)
134. A small room that holds HVAC equipment. (7/15/09)
135. You can see the bathroom tile and paint in the women's restroom outside of the Community Room. (7/15/09)
136. The Community Room is painted. (7/15/09)
137. There is a shower outside of the Youth Area. (7/15/09)
138. A drainage system is installed on the north side of the building. (7/15/09)
139. The gym floor was poured early the morning of July 22.
140.
The concrete was brought in "Georgia buggies." (7/22/09)
141. Ninety-nine yards of concrete were used. One yard covers exactly 81 square feet at 4" thick.
(7/22/09)
142. The floor was laid down with a laser screed. Workers are riding floating machines that flatten the floor. After they flatten the floor, they'll take off the bottom pans and it becomes a trowlling machine that puts a fine smooth finish on the floor. (7/22/09)
143. Workers also did some smoothing work with hand trowels or those on their feet. (7/22/09)
144. The concrete floor was covered with plastic to allow it to wet cure over the weekend. (7/26/09)
145. The wooden chair rail was put up in the Community Room. (7/26/09)
146. The bulkheads in the "Mall" area are primed. (7/26/09)
147. In both the east and west entrances, decorative crosses have been installed in the top glass panels. (7/26/09)
148. In the small corridor leading back into Fellowship Hall, a circular bulkhead is being built. (7/26/09)
149. An exterior finish is being installed above the west entrance. (7/27/09)
Click to view build photos during June 2009
Click to view build photos during May 2009
Click to view build photos during April 2009
Click to view build photos during: October 2008 - March 2009
Site designed by Higgens Media