Sign up for our electronic newsletter:
Subscribe | Learn More


Excitement Is Building Ephesians 2:22


The O'Dell Family Life Center: Photos from June 2009

 


Descriptions of Photos

91. Ceiling work in Mt. Auburn Mall. (6/2/09)
92. More interior ceiling work. (6/2/09)
93. Steel-stud framing is up in the cooridor leading out to the north entrance. (6/2/09)
94. The framing is placed around the skylight inside Mt. Auburn Mall and just outside our current Fellowship Hall. (6/2/09)
95. The brick work and framing is complete on a section of the "Mall." Next drywall... (6/2/09)
96. A beautiful shot of the skylight and the light that will illuminate this part of the building. (6/2/09)
97. In the gym ceiling, pipes for a fire safety sprinkler system are installed. (6/2/09)
98. High work on the top of the brick on east entrance. Always pray for the safety of our crew! (6/2/09)
99. Cornerstones are placed. To the left of the new O'Dell Family Life Center 2009, is one from Mt. Auburn's second home across the street from our current building. It reads: Mt. Auburn M.E. Church 1904. (M.E. stands for Methodist Episcopal). (6/14/09)
100. Some areas have unique curved drywall. This is just outside the Community Room and Kitchen. (6/14/09)
101. Outside the west entrance, you can see an outside delivery area for the kitchen and the brick work to hide trash recepticals. (6/17/09)
102. Brick work is complete on the west side of the exterior building. (6/17/09)
103. A view of the north and northwest corner of the building. (6/17/09)
104. Real doors! The doors to the north entrance are installed. (6/17/09)
105. Looking to the west on the north side of the building. (6/17/09)
106. Steel-stud framing on the east side of the stage in the gymnasium. (6/17/09)
107. A front view of the gym and all the framing. (6/17/09)
108. More drywall goes up in the cooridro to north entrance. (6/17/09)
109. The Youth Center is large enough to not only store youth, but drywall during construction! (6/17/09)
110. West side of stage ramp and framing. (6/17/09)
111. A door just west of the entrance back into Fellowship Hall. This doorway will eventually lead to a classroom that we will turn into a library. (6/17/09)
112. The east doors are installed. (6/30/09)
113. The stage looks like a real stage with the drywall going up! (6/30/09)
114. A worker is smoothing on mud during the drywalling process. (6/30/09)
115. The bulk heads look great once all drywalled in. (6/30/09)
116. The Community Room with lights and drywall. (6/30/09)
117. The exhaust hood has been installed in the kitchen. (6/30/09)
118. This exhaust goes over the dishwasher in the kitchen. (6/30/09)
119. John Skaggs is standing in what he calls, the "garage, " a place where all the AV equipment will be stored in the gym area.


Click to view build photos during May 2009

Click to view build photos during April 2009

Click to view build photos during: October 2008 - March 2009

Back to Top