63. Curb work begins on the west parking lot. (5/1/09)
64. Concrete on the east side of the stage is poured. (5/7/09)
65. Duct work in the gym begins. (5/7/09)
66. Interior brick work continues. Shown here is the outside of Mt. Auburn's "food pantry" entrance. (5/7/09)
67. More interior brick work. This is one of the arcs underneath the "mall's" skylight. (5/7/09)
68. Paint goes up for the first time on east exterior wall! (5/11/09)
69. More painting. (5/11/09)
70. The steel-stud framing on the interior goes up quickly. (5/11/09)
71. Work continues on the exterior west fall facing the ball fields. (5/11/09)
72. Duct work in the hall way off the "mall" area that leads back to youth center. (5/11/09)
73. On Sunday, May 17, the congregation was invited to tour the construction site for the first time. (5/17/09)
74. Samples of the interior finishings were able to view. (5/17/09)
75. The youth are shown as they see their area for the first time! (5/17/09)
76. Dr. and Mrs. Hertel share the excitement of the day with Marge Patton. (5/17/09)
77. The kitchen had displayed specs of each appliance that will some day be in the space. (5/17/09)
78. Sidewalks are installed near the current playground. (5/20/09)
79. Painting continues on the southeast side of the gymnasium. (5/20/09)
80. Inside the gym, if you look hard, you can see that a sprinkler system is installed in the ceiling. (5/20/09)
81. Bulk heads are beginning to take shape in the "mall" area. (5/20/09)
82. The finished sidewalk near the current playground. (5/31/09)
83. Brick work begins on the east entrance. (5/31/09)
84. The gym painting on the east side in complete. (5/31/09)
85. A sidewalk in poured around the east perimeter. (5/31/09)
86. Work continues in the "mall" area. (5/31/09)
87. Curved bulk heads appear near the west main entrance. (5/31/09)
88. The west entrance has the bricking near completion. You can see the youth and community room doors. (5/31/09)
89. This shows the kitchen entrance and brick area that will hide trash receptacles and a loading/unloading area. (5/31/09)
90. Curbs in the north west portion of the parking lot. (5/31/09)