Excitement Is Building Ephesians 2:22


The O'Dell Family Life Center: Photos from April 2009

     


Descriptions of Photos

36. On Sunday, March 29, members of the church were invited to take part in the build by signing a steel beam. (3/29/09)
37. Even the children wrote messages! (3/29/09)
38. The steel construction over the kitchen, community center and youth area is shown here. (3/29/09)
39. A trench for conduit is dug. (4/1/09)
40. Construction seen inside the Family Life Center in the southeast corner. (4/1/09)
41. Looking up and out from the "Mt. Auburn Mall" area. (4/1/09)
42. Looking west through the "Mall" area. Roof work begins. (4/1/09)
43. A worker digs more trenches for conduit. (4/2/09)
44. One of the skylights is delivered. (4/2/09)
45. Progress is really being made on the roof of the kitchen, community center and youth area. (4/10/09)
46. Looking east on the Mt. Auburn Mall area on April 10, 2009.
47. More work continues on the roof area of the kitchen, community center, and youth area. (4/15/09)
48. The roof as seen from a second story Teen Center window. (4/15/09)
49. Conduit covered and ready! (4/15/09)
50. The first few bricks are laid on the west wall. (4/15/09)
51. The ground is smoothed on the west side and roof work continues. (4/15/09)
52. The crew works on the roof of the west side of the family life center. (4/17/09)
53. Workers hand-trow the cement floor after it's been poured to get it level and smooth. (4/22/09)
54. You can see conduit sticking out for the community center and nearby facilities. (4/22/09)
55. Steel-stud frame work on the exterior west wall goes up. (4/22/09)
56. A great view of the stage. (4/22/09)
57. A straight-on view of the stage. The beam across the top is the one congregation members signed! (4/22/09)
58. The ramp area leading up to the stage has been poured. (4/22/09)
59. Brick work continues. This is near the soon-to-be east entrance into the Mt. Auburn mall area. (4/22/09)
60. After the "mall" area has concrete poured, the crew cleans up. (4/27/09)
61. The exterior steel stud frames are covered with a green insulation board. (4/27/09)
62. The area outside the gym before any interior framing goes up. (4/27/09)