The O'Dell Family Life Center - Building progress from Oct. 2008-March 2009
- On Oct. 12, 2008, the congregation unanimously voted to accept plans for the O'Dell Family Life Center.
- On Sunday, Nov. 9, Rev. J. William Keith, District Superintendent, officiated a chilly, but exciting Groundbreaking Ceremony before the entire congregation.
- The Building Committee at the Groundbreaking Ceremony on Nov. 9, 2008.
- Look closely and you'll see the new kitchen and other areas outlined in paint!
- All county and sewer permits have been received. T&W Construction begins their mobilization after a pre-construction start meeting on Jan. 26, 2009. Snowy weather doesn't stop sod and snow removal for a new parking lot on the west side of the building. (1/29/09)
- Back-filling with stone for the new west parking lot. (2/1/09)
- On Thursday, Jan. 5, a bulldozer is seen excavating the back lot. (2/5/09)
- Smoothing sand and gravel on south lot for the foundation. (2/6/09)
- It's official - enter the doors on the west side of the building on Sunday mornings! (2/8/09)
- A fence now surrounds the construction area. (2/9/09)
- A bulldozer digs the footings for the Family Life Center. (2/17/09)
- Concrete is poured for the foundation footings. (2/17/09)
- The construction crew worked on installing pre-cast panel supports. (2/26/09)
- Today the crew started placing the pre-cast concrete wall panels. (3/2/09)
- They are set in place with a 120-foot crane. (3/2/09)
- This particular wall is part of the 4-hour firewall between our existing building and our new structure. (3/2/09)
- Most panels are 12' wide by 9" thick and 29' tall. They are made by ADM, a manufacturer from Mt. Comfort, IN. (3/2/09)
- More of the gym walls go up. This is the east wall facing McDonalds. (3/5/09)
- The north and east gym walls go up. (3/5/09)
- These gentleman know what they're doing! (3/5/09)
- A great warm, sunny day speeds progress. (3/5/09)
- The south walls that will form the gym and Mt. Auburn mall area. (3/5/09)
- Block is laid for the foundation of other areas of the Family Life Center. (3/6/09)
- Block work continues. (3/6/09)
- Laying more block. (3/9/09)
- Foundation block on the west side of the building. (3/9/09)
- A view of the pre-cast supports inside the gym. (3/18/09)
- A brick sample of what's to come! (3/18/09)
- Outer perimeter of foundation block. (3/18/09)
- Block outlines west entrance curve. (3/18/09)
- A view from northwest corner. (3/18/09)
- The beginnings of inside structures. (3/18/09)
- The steel frame for the youth area, community room and kitchen go up. (3/26/09)
- The roof connecting the new and current building is put in place. Trusses from Newcomber Lumber are used. (3/24/09)
- John Skaggs and Brian Southern stand in "Mt. Auburn Mall" and hallway area leading to youth room. (3/26/09)